This is going to be a long post with lots of pictures. While it is still work on the Nyne, this is largely an experiment/how-to-guide using Band-It wood veneer strips, wood filler, and wood stain. When conceptualizing the Nyne, my initial idea was to have the floors be removable. To plan for that, I cut […]
Archive | Work In Progress
Building the Nyne House Part 3: Material and Furniture Placement Planning
Its Monday and Thanksgiving is in just a few days.. scary how time flies! This will also probably be the last post until after Thanksgiving since I have gobs of work to do, gobs of family events to go to, and gobs of turkey to eat! This is a rather simple post anyway. Its all […]
Building the Nyne House Part 2: First Floor Walls
These pictures have been sitting in my hard drive for a few days, but I only got around to editing and posting them until now. Its not much, its just putting up the first floor, load bearing walls for the Nyne. I used polyurethane Gorilla Glue and “nailed” in toothpicks (pictured above) to join the two pieces together. […]
Coventry Cottage Project Part 13: The Front Porch
I finally got to use those “flagstone” pieces that I made for the Coventry Cottage porch. I used spackle as the grout. It was pretty tough with spackle because it dries so quickly, which I expected. But I didn’t expect the difficulty of doing it in such a confined space. Its finally done and boy […]
Coventry Cottage Project Part 12: Interior Trims
Its been a while since I posted any updates on my Coventry Cottage project… over a whole month in fact! So here’s a pretty long post on what went on. Starting off, I made a junky paint box to aid in the painting. Its a horrible excuse for a paint box since its too small […]